Canon iR2200 Průvodce nastavením Strana 28

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 362
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 27
Periodic Inspection of the Breaker
xxvi
xxvixxvi
xxvi
4
44
4
Move the breaker lever to the ON position (“I” side).
Move the breaker lever to the ON position (“I” side).Move the breaker lever to the ON position (“I” side).
Move the breaker lever to the ON position (“I” side).
IMPORTANT
If the breaker lever stops between ON and OFF, move the breaker lever to OFF, then back to ON.
5
55
5
Press the main power switch to the ON position (“I” side).
Press the main power switch to the ON position (“I” side).Press the main power switch to the ON position (“I” side).
Press the main power switch to the ON position (“I” side).
6
66
6
Fill in the check sheet for the periodic inspection of the breaker, located at
Fill in the check sheet for the periodic inspection of the breaker, located at Fill in the check sheet for the periodic inspection of the breaker, located at
Fill in the check sheet for the periodic inspection of the breaker, located at
the end of this manual.
the end of this manual.the end of this manual.
the end of this manual.
ON
(“I
II
I” side)
OFF
(“ ” side)
ON
(“I
II
I” side)
OFF
(“ ” side)
ON
(“I
II
I” side)
OFF
(“ ” side)
Downloaded from ManualsPrinter.com Manuals
Zobrazit stránku 27
1 2 ... 23 24 25 26 27 28 29 30 31 32 33 ... 361 362

Komentáře k této Příručce

Žádné komentáře