
Carrying the Machine to the Installation Site and
Removing the Packing Materials
01
See the included “READ THIS SHEET FIRST!”
before carrying the machine to the installation
site.
02
Remove all shipping tape from the ap side
edges.
03
Open the feeder, remove the protective sheet,
and take out the drum unit.
Komentáře k této Příručce